Two of the six cabins in
The Village of the Lost Boys have been sponsored and funded. Our intention is to finish those two, then wait for the other 4 to be funded. The good news is that all the architectural drawings have been approved, the permits have been granted, the fire road has been built and inspected, the septic system has been designed, approved, installed, and inspected, and the electrical service is being installed even as you read this. All of those things were paid for by the Lost Boys, a group of business leaders that has been meeting once-a-year on campus for the past 5 years.